News · Murfreesboro
Murfreesboro breaks ground on a 40-bed rehabilitation hospital, so stroke and brain-injury patients can recover without driving to Nashville
MURFREESBORO — Rutherford County patients recovering from a stroke, a brain injury or a major surgery will have a dedicated inpatient rehabilitation hospital close to home by late 2027. Ascension Saint Thomas and Lifepoint Rehabilitation broke ground Tuesday, Oct. 27, on the Ascension Saint Thomas Rutherford Rehabilitation Hospital, WGNS reported.
What is being built. The two-story hospital will be about 62,700 square feet on a four-acre site less than 600 yards from Ascension Saint Thomas Rutherford hospital. It opens with 40 beds, all in private rooms, and the building is laid out to add 10 more beds later.
Plans include a 12-bed unit for acquired brain injuries, a physical therapy gym, a covered outdoor therapy courtyard, a pharmacy, dining space and therapy work rooms. Lifepoint Rehabilitation, a unit of Brentwood-based Lifepoint Health, will run the hospital through a joint venture with Ascension Saint Thomas.
Who it is for. Inpatient rehabilitation is the intensive, hours-a-day therapy many patients need after a hospital stay for a stroke, a brain or spinal cord injury, an amputation, major trauma or orthopedic surgery. Today, many Rutherford County families make the drive to Nashville for that care, WGNS noted. Because the new hospital sits next to the existing one, the two will share medical records and coordinate care.
Daphne David, president and CEO of Ascension Saint Thomas Rutherford, said that after a century of caring for local families, the partnership lets patients recover near the people who support them, WGNS reported. Russ Bailey, president of Lifepoint Rehabilitation, said the arrangement helps patients rebuild life skills and get home sooner.
Jobs. The partners expect to create about 86 full-time-equivalent jobs in the first year of operation, roughly 44 clinical and 42 nonclinical, according to WGNS.
How it got here. The project received state approval for construction in April 2025, according to Ascension.
What it means for you. Nothing changes yet for patients; construction is expected to wrap up in late 2027. Families who need inpatient rehabilitation before then should ask a hospital case manager about current options in Rutherford and Davidson counties.
Sources:
WGNS Radio, “Ascension Saint Thomas and Lifepoint Break Ground on New Murfreesboro Rehabilitation Hospital,” Oct. 27, 2026 (groundbreaking, size, site, beds, units, joint venture, David and Bailey remarks, 85.7 FTE jobs, late 2027 completion), https://www.wgnsradio.com/article/101795/ascension-saint-thomas-and-lifepoint-break-ground-on-new-murfreesboro-rehabilitation-hospital
Ascension, “Ascension Saint Thomas, Lifepoint Rehabilitation receive state approval for construction of new rehabilitation hospital in Murfreesboro,” April 2025, https://about.ascension.org/news/2025/04/ascension-saint-thomas--lifepoint-rehabilitation-receive-state-approval-for-construction-of-new-rehabilitation-hospital
Photo: Coinmanj, “StThomas-Rutherford.jpg,” March 13, 2014, Wikimedia Commons, CC BY-SA 3.0 (https://creativecommons.org/licenses/by-sa/3.0/), cropped and color-adjusted; derivative shared under the same license, https://commons.wikimedia.org/wiki/File:StThomas-Rutherford.jpg
