News · Upper Cumberland
TDOT’s SR 299 and I-40 meeting is 5 to 7 today in Crab Orchard
CRAB ORCHARD — TDOT will take comments today on a wider SR 299 where it meets Interstate 40, from 5 to 7 p.m. Central at Crab Orchard Elementary.
The department’s release, sent Monday, says the meeting is an open house at 240 School Road, Crab Orchard, TN 37723. People can come any time in the two hours. Displays, maps and preliminary plans will be up. Staff will be in the room. A presentation runs continuously. There is no sign-up speech. The proposed work would widen SR 299 from two lanes to five lanes north of Pig Path Road, replace the bridge with a five-lane signalized bridge, and rebuild the eastbound and westbound I-40 ramps. The release says the point is traffic flow, capacity and safety at what it calls a gateway interchange. Comments collected today feed the next design steps. The release does not set a construction date or a cost.
Five to seven Central is 6 to 8 Eastern. A reader in Knoxville who treats the clock as Eastern will arrive an hour late for the start and on time for the last hour. The school address is the place, not a TDOT office in Chattanooga, which is where the release was datelined.
What is drawn, and what is not funded in the notice
Widening, a new bridge and new ramps are the three pieces named. A price, a letting date and a detour during construction are not in the notice that was read. The meeting is the chance to say which of those pieces matters. The photograph is I-40 in the region. It is not the SR 299 bridge and it is not the elementary school gym. The open house is 5 to 7 p.m. Central today at 240 School Road. The plan is five lanes north of Pig Path Road, a new bridge, and rebuilt ramps. No price was listed. Crab Orchard Elementary is the room, not a project office in Chattanooga, which is only the dateline. Arriving at 5 p.m. Central is 6 p.m. Eastern. The open house runs two hours, and a presentation loops the whole time, so missing the first minutes does not mean missing the plans. Widening north of Pig Path Road, a signalized five-lane bridge, and both I-40 ramps are the three pieces on the boards. A construction date was not set in the notice. Comments go to the staff in the room. The address is 240 School Road, Crab Orchard, TN 37723. The window is two hours, and nobody has to sign up to speak.
Sources:
TDOT release via Public, “TDOT Hosts Public Meeting for SR 299 Interchange at I-40 in Cumberland County,” Nov. 9, 2026, https://pubt.io/view/041F4C0503FC4DF62E86581A8C1B866083A9A59F
Photo: Bneu2013, “I-40 east Crab Orchard Mountains.jpg”, Wikimedia Commons, CC BY-SA 4.0, https://commons.wikimedia.org/wiki/File%3AI-40_east_Crab_Orchard_Mountains.jpg
